Closing the Operations Gap: Turning Technical Functionality into Operational Capability
By NATSDelays and cost overruns on air traffic control (ATC) technology and infrastructure projects are common place for many airports.
Governments and ATC organisations often cite a mismatch between the project's requirements and the usability of the new system by front-line operations. Or, there are difficulties bringing together new technologies with an array of existing systems to create a fully integrated system.
Please download this free white paper for more information